> > > >>
TÂN LONG
Certified Local Engineering Services in Binh Dinh

Industrial Cold Storage Turnkey Contractor in Binh Dinh

Reputable cold storage construction unit in Binh Dinh - Specializing in blast freezer for Quy Nhon tuna, food preservation warehouse in Phu Tai & Nhon Hoi Industrial Park.

Tan Long Refrigeration is a leading EPC general contractor providing turnkey industrial cold storage systems, quick blast freezers, and cold chain solutions in Binh Dinh, complying with international HACCP, ISO 22000, and FDA export standards.
Get Project Quotation Engineering Hotline: 0933 357 058
20+ Years
EPC General Contractor Track Record
-25%
VFD Inverter Power Savings
45 - 90 Mins
On-Site Survey Response
24 Months
24/7 Turnkey Warranty

1. Specific Needs & Cold Storage Demands in Binh Dinh

Binh Dinh province is the cradle of ocean tuna fishing in Vietnam with a strong offshore fishing fleet docking at Quy Nhon and Tam Quan ports (Hoai Nhon). In addition to its strength in seafood, Binh Dinh also strongly develops industrial parks for wood processing, animal feed, and logistics warehouses in Phu Tai Industrial Park, Nhon Hoa Industrial Park and Nhon Hoi Economic Zone.

Tan Long is proud to provide optimal cold storage solutions in Binh Dinh: Ultra-deep tuna freezing tunnel complex (-40°C to -50°C), stainless steel flake ice mortar for preserving fish on long-term fishing vessels, cold storage for meat, livestock and poultry, and cool storage system for agricultural products for businesses exporting through Quy Nhon Port.

Industrial cold storage project executed by Tan Long in Binh Dinh
Turnkey industrial cold storage facility executed by Tan Long in Binh Dinh, compliant with HACCP and ISO 22000 standards.

2. Key Industrial Parks & Strategic Logistics Zones Served in Binh Dinh

Tan Long engineering teams have deployed cold storage facilities, blast freezers, and cleanrooms across major industrial zones in Binh Dinh:

Phu Tai Industrial Park & Long My Industrial Park (Quy Nhon City)

Long-standing key industrial park, concentrating on wood processing factories, seafood and logistics warehouses.

Nhon Hoi Economic Zone & Quy Nhon International Port

International trade hub at the gateway to the Central Highlands, marine container cold storage center.

Nhon Hoa Industrial Park (An Nhon Town)

Focus on factories producing animal feed and processing food for domestic consumption.

Tam Quan Fishing Port Cluster (Hoai Nhon Town)

Capital of the province's largest ocean tuna fishing fleet, demand for flake ice mills and blast freezing chambers is very high.

3. Latest 2026 Cold Storage Installation Pricing in Binh Dinh

The pricing below represents a comprehensive turnkey estimate including: Insulated sandwich panels (PIR/PU), imported compressor rack, air coolers, PLC automation cabinet, doors, and on-site turnkey installation in Binh Dinh:

Volume (m³) Dimensions L x W x H (m) Chilled Store (+2°C to +10°C) Frozen Store (-18°C to -25°C) Recommended Compressor Rack
20 m³ 3.0 x 2.5 x 2.7m 68.000.000 VND - 78.000.000 VND 85.000.000 VND - 98.000.000 VND Copeland / Bitzer 3.0 HP
50 m³ 5.0 x 4.0 x 2.5m 115.000.000 VND - 130.000.000 VND 145.000.000 VND - 165.000.000 VND Bitzer Piston 5.0 HP
100 m³ 8.0 x 5.0 x 2.5m 180.000.000 VND - 210.000.000 VND 230.000.000 VND - 260.000.000 VND Bitzer / Hanbell 7.5 HP
200 m³ 10.0 x 6.5 x 3.0m 290.000.000 VND - 330.000.000 VND 380.000.000 VND - 430.000.000 VND Bitzer Screw 15 HP
500 m³ and above Per Actual Jobsite Layout Custom Engineering Proposal Custom Engineering Proposal Mycom / Kobelco Screw

* Note: Actual turnkey quotation may vary depending on refrigerant piping distance, local fire protection standards, and 3-phase electrical connections at the Binh Dinh jobsite. Contact hotline (+84) 933 357 058 for an itemized estimate within 15 minutes.

FREE ENGINEERING SIZING TOOL

Cold Storage Heat Load Sizing & Pricing Calculator for Binh Dinh

Calculate required kW/HP cooling capacity, panel insulation thickness, and estimated turnkey project investment in 30 seconds.

4. Featured Regional Projects Executed by Tan Long

Tam Quan Tuna Freezing Tunnel Complex

Hoai Nhon, Binh Dinh Town

Technical Configuration: 2 freezing tunnels of 10 tons/batch at -40°C temperature, 2-stage Mycom compressor, 5m/s cooling fan fan.

Cold Logistics Distribution Center Quy Nhon Port Cargo Movement

Quy Nhon City, Binh Dinh Province

Technical Configuration: Capacity 4,500m³, wide temperature range -20°C to +8°C, SCADA energy management system saves 20% electricity.

Cold Storage for Processed Meat Phu Tai Industrial Park

Quy Nhon City, Binh Dinh Province

Technical Configuration: Fireproof PIR panel 125mm thick, fast rolling door automatically prevents heat loss when forklifts enter and exit.

Tan Long industrial refrigeration compressor station installed for projects in Binh Dinh
VFD inverter screw compressor rack assembled at Tan Long factory delivered to clients in Binh Dinh.

5. 6-Phase Turnkey Cold Storage Construction Protocol by Tan Long in Binh Dinh

01

1. Complimentary On-Site Jobsite Survey

Tan Long certified refrigeration engineers conduct on-site dimension surveys, verify electrical transformer capacity, and optimize layout.

02

2. 3D Thermodynamic Modeling & BOQ

Generating detailed 2D/3D BIM drawings, calculating precise kW thermal loads, and providing transparent itemized BOQ.

03

3. Off-Site Factory Prefabrication

Manufacturing PIR/PU panels and assembling compressor racks at Duc Hoa 1 plant under strict ISO 9001:2015 quality control.

04

4. Structural Enclosure & Mechanical Installation

Certified mechanical teams erect Camlock panels with airtight joints, lay copper/steel piping, and mount evaporator units.

05

5. Nitrogen Pressure Testing & Deep Evacuation

Three-stage nitrogen pressure testing per DIN EN 378 and deep vacuuming (< 500 microns) before refrigerant charging.

06

6. 72-Hour Commissioning, Acceptance & Handover

Continuous 72-hour temperature pull-down testing, complete technical documentation handover, and staff training.

6. Technical FAQs on Cold Storage Installation in Binh Dinh

Q: How long is the construction time to complete a tuna cold storage in Binh Dinh?

Depending on project scale. With cold storage from 50m³ to 200m³, Tan Long completes within 10-15 days. With large freezer and warehouse complexes of over 1,000 tons in Quy Nhon, the construction time to complete is 30-45 days including the cold load testing period.

Q: What is Tan Long's warranty and emergency technical response policy in Binh Dinh?

All cold storage facilities constructed in Binh Dinh receive a 24-month comprehensive manufacturer warranty on compressor machinery and 5 years on insulated panels. Our 24/7/365 regional emergency team guarantees rapid on-site arrival.

Q: Can a cold storage unit be installed in Binh Dinh if the jobsite does not have a 3-phase power supply?

For compact cold rooms under 20m³, Tan Long offers compressor configurations compatible with single-phase 220V residential power. However, for cold storage facilities of 30m³ and above, a 3-phase 380V power supply is required for compressor durability and energy efficiency. Tan Long engineers will provide electrical load calculations and engineering submittals to assist in rapid utility grid application.

EPC TURNKEY CAPABILITY & NATIONWIDE FLAGSHIP PROJECTS

Tan Long operates a nationwide engineering and 24/7 technical support network, having engineered and constructed landmark industrial cold storage projects across Vietnam:

TECHNICAL EXPERT VERIFICATION

Updated: September 2026 • Standards: TCVN 6739 & QCVN 06:2022
Eng. Nguyen Van Long - EPC Technical Director
EXPERT AUTHOR

Eng. Nguyen Van Long

EPC Technical Director & Head of Refrigeration Solutions, Tan Long

20+ years EPC experience in industrial cold storage systems, IQF quick freezers, and automated ASRS facilities. Thermal Engineering alumnus from HCMC University of Technology, VISRAE Executive Board member.

M.Sc. Tran Dinh Hung - Pressure Safety Lead, Tan Long
TECHNICAL VERIFICATION

M.Sc. Tran Dinh Hung

Pressure Vessel Safety Verification & Energy Auditing Lead

15+ years leading NH3 piping pressure safety proofing, COP energy audits, and fire protection certification for PIR/PU panel enclosures under QCVN 06:2022/BXD.