Featured EPC Project • Engineering Case Study

Kyokuyo Vina Foods Cold Storage Project (Japan)

Design and construction of a cold storage system for seafood processing exported to the Japanese market for Kyokuyo Group. Sterile heat and humidity control system, abrasion-resistant concrete floor and ultra-quiet energy-saving compressor system.

Client: Kyokuyo Vina Foods Co., Ltd (Japan) • Location: Duc Hoa 1 IP, Long An, Vietnam
Scope: Complete design, assembly, and commissioning of a 2,500 kW NH3 compressor station and IQF line.
Client / Investor: Kyokuyo (Japan) Corporation
Location: Long Hau, Can Giuoc, Long An Provincial Industrial Park
Scale & Capacity: 3,000 Tons of Deeply Processed Seafood
Design Temperature: -25°C ÷ -28°C
Conquering the world's most rigorous standards: Japanese businesses are world-famous for their meticulousness, discipline and millimeter-precise technical requirements. The fact that Tan Long was trusted and selected by Kyokuyo Group is the clearest proof of the world-class quality of Refrigeration & Electrical Engineering Vietnam.

1. Stringent Quality Requirements from Japanese Investors

Dự án kho lạnh và phòng sạch chế biến thủy sản Kyokuyo Vina Foods
Cold storage area and Japanese standard seafood processing factory at Kyokuyo Long Hau factory
  • Extremely small temperature error: Temperature fluctuations throughout the entire warehouse volume must not exceed ±0.3°C at any measuring point to ensure the quality of thousands of tons of premium sashimi seafood.
  • Surface material is absolutely non-contaminating: 100% of food contact warehouse covers use mirror-polished 304 BA Stainless Steel PU panel that does not adhere to bacteria.
  • Air filtration system to disinfect buffer rooms: Install UV disinfection light system and HEPA filters at all goods circulation doors.

3. Refrigeration Load Testing Log & Handover Acceptance

Kho lạnh logistics thực phẩm tiêu chuẩn Nhật Bản Kyokuyo
The cold chain distribution center meets Kyokuyo group's strict hygiene standards

The commissioning and technical acceptance protocol was strictly executed across 4 phases adhering to ASHRAE and TCVN 6739:2015 standards under independent investor supervision:

  • Phase 1 - Pressure Tightness & Strength Testing: All liquid refrigerant piping and suction lines were pressurized with dry nitrogen gas at 24.5 bar continuously for 24 hours. Pressure drop recorded via digital precision gauges after ambient temperature compensation was 0.00 bar (100% absolute hermetic sealing).
  • Phase 2 - Deep Vacuum Dehydration & Moisture Evacuation: Utilizing specialized industrial two-stage high-capacity vacuum pumps, system pressure was drawn down below 450 microns (0.6 mbar) and held for 12 hours to completely vaporize and evacuate residual internal moisture.
  • Phase 3 - Refrigerant Charging & No-Load Dry Run: Charging certified genuine virgin refrigerant, initiating screw compressor stages sequentially, verifying motor rotation, starting current, mechanical vibration levels, and calibrating dual high/low safety pressure relief switches.
  • Phase 4 - 72-Hour Continuous Full-Load Commissioning: Product staging loaded in progressive 30% capacity increments to avoid thermal shock. The IoT temperature monitoring system recorded the pulldown curve from +28°C to target deep-freeze setpoints within 8 hours, with room-wide spatial temperature deviation strictly constrained within ±0.5°C.

4. Economic Efficiency & Return on Investment (ROI) Analysis

An engineered cold storage facility designed to international standards not only preserves product freshness but delivers substantial financial returns over its 20-year operational lifecycle:

  • Direct 20% - 25% Reduction in Monthly Power Bills: Premium insulation with high-density 42 kg/m³ PU Camlock panels, paired with high-efficiency Inox 304 evaporative condensers and VFD compressor inverter controls, saving 25,000 to 60,000 kWh per month compared to conventional legacy installations.
  • Mitigating 99.9% Product Spoilage Risk: Eliminating temperature fluctuations and cold burn on product surfaces, achieving a 100% export grade-A qualification rate.
  • Rapid Capital Payback Period: Substantially reduced utility bills and reliable industrial-grade components virtually eliminate unplanned downtime, shortening overall investment payback to just 2.5 to 3 years.

5. Operational Safety Guidelines for Plant Engineering Teams

Following handover, Tan Long conducted on-site technology transfer and operational training for the plant engineering team:

  1. Daily: Inspect compressor lubrication oil levels via sight glass, logging suction pressure, discharge pressure, and refrigerant discharge temperature.
  2. Weekly inspection of door seal tightness on sliding cold room doors and photoelectric sensor cleaning on PVC high-speed roll-up doors.
  3. Monthly: Flush sediments from evaporative condenser water sumps and verify supply phase voltages at the electrical control panel.
  4. Execute routine preventive maintenance according to Tan Long's NH3 screw compressor maintenance procedures.

Technical FAQs on the Project Kyokuyo

1. What acceptance and quality criteria did Japanese auditors use to commission the cold storage?

Japanese experts use infrared thermomeasuring equipment to scan the entire ceiling wall surface to check the thermal bridge, measure tightness using positive air pressure, check compressor noise and take microbiological samples on the stainless steel surface before signing the handover record.

NEED A TURNKEY EPC INDUSTRIAL COLD STORAGE SOLUTION?

Tan Long provides turnkey EPC services: Heat load analysis - Genuine equipment procurement - ISO/HACCP certified installation - 24/7 preventive maintenance. Guaranteed 25% - 30% operating power savings.

TECHNICAL EXPERT VERIFICATION

Updated: September 2026 • Standards: TCVN 6739 & QCVN 06:2022
Eng. Nguyen Van Long - EPC Technical Director
EXPERT AUTHOR

Eng. Nguyen Van Long

EPC Technical Director & Head of Refrigeration Solutions, Tan Long

20+ years EPC experience in industrial cold storage systems, IQF quick freezers, and automated ASRS facilities. Thermal Engineering alumnus from HCMC University of Technology, VISRAE Executive Board member.

M.Sc. Tran Dinh Hung - Pressure Safety Lead, Tan Long
TECHNICAL VERIFICATION

M.Sc. Tran Dinh Hung

Pressure Vessel Safety Verification & Energy Auditing Lead

15+ years leading NH3 piping pressure safety proofing, COP energy audits, and fire protection certification for PIR/PU panel enclosures under QCVN 06:2022/BXD.